Optaplanner : Optimal count of number of steps for termination - optaplanner

I am setting my solver local search phase termination strategy based on total number of steps. I see that when I set number of steps as 80,000 it terminates inside 30 mins. So I set it around 200,000 and expect it to terminate within 2-3 hours.
However, even after a day it hasn't terminated. I then ran it with DEBUG logs and found that after around 90,000 steps, the time taken per steps starts increasing and around 100,000 mark it just does not take any new steps.
What could be causing this? If it has exhausted all the steps does it not terminate automatically?

In Late Acceptance (the default algo) and Simulated Annealing the number of steps per minute varies greatly depending on how long it's been running. In the beginning they are fast stepping, because they are far more likely to accept a move (which triggers going to the next step) and over time they become slow stepping, because they are far less like to see a move that they like as they become near optimal.
Tabu Search is pretty consistent n in the number of steps per minute.

Related

Is there a function for aborting routing calculation in optaplanner?

I want to have a function like if the calculation time get too long, we abort routing calculation and submit the best solution at the point of time. Is there such a function in optaplanner ?
For example in a GUI application, you would start solving on a background (worker) thread. In this scenario you can stop solver asynchronously by calling solver.terminateEarly() from another thread, typically the UI thread when you click a stop button.
If this is not what you're looking for, read on.
Provided that by calculation you actually mean the time spent solving, you have several options how to stop solver. Besides asynchronous termination described in the first paragraph, you can use synchronous termination:
Use time spent termination if you know how much time you want dedicate to solving beforehand.
Use unimproved time spent termination if you want to stop solving if the solution doesn't improve for a specified amount of time.
Use best score termination if you want to stop solving after a certain score has been reached.
Synchronous termination is defined before starting the solver and it's done either by XML solver configuration or using the SolverConfig API. See OptaPlanner documentation for other termination conditions.
Lastly, in case you're talking about score calculation and it takes too long to calculate score for a single move (solution change) then you're most certainly doing something wrong. For OptaPlanner to be able to search the solution space effectively, the score calculation must be fast (at least 1000 calculations per second).
For example in vehicle routing problem, driving time or road distances must be known at the time when you start solving. You shouldn't slow down score calculation with a heavy computation that can be done beforehand.

What is the idle ramp up period for the 1000 users in the JMeter, while working on SharePoint online app?

While working on the SharePoint app, I noticed that it takes more than 10 seconds to load the app first time. so, I was thinking that how much ramp-up period will be idle for running 1000 users on JMeter?
Not sure about the "idle", do you mean "ideal" ramp-up?
I believe the slow initial load can be explained by how IIS internally works:
https://social.technet.microsoft.com/Forums/ie/en-US/297fb51b-b7b4-4b7b-a898-f6c91efd994e/sharepoint-2013-first-load-takes-long-time?forum=sharepointadmin
Taking all that the information into account, we can predict that high response times due to the long initial load will occur for at most several minutes in the beginning of your test and affect the users which are started during this period.
Finding out the "ideal" ramp-up time can be a little bit tricky.
I would address the problem like that:
Add the Response Times Over Time (https://jmeter-plugins.org/wiki/ResponseTimesOverTime/) graph.
Set the ramp-up time to 10 seconds per user and, using the graph added above, find out when the response times will settle down. This will mean that the initial load of the application is completed. Don't forget to exclude this period from the report.
Now you should observe that the response times are slowly growing with the addition of new users.
After the addition of all of the users, if everything went well, you can try to lower your ramp-up time to, say, 3600 seconds for all of the users.
If you see that the response times skyrocketed and/or exceeded the SLA, than you either are adding the users too fast, or the application is already saturated.

Optaplanner - Real-time planning doesn't find good solution

I am trying to use real time planning using a custom SolverThread implementing SolverEventListener and the daemon mode.
I am not interested in inserting or deleting entities. I am just interested in "updating" them, for example, changing the "priority" for a particular entity in my PlanningEntityCollectionProperty collection.
At the moment, I am using:
scoreDirector.beforeProblemPropertyChanged(entity);
entity.setPriority(newPriority);
scoreDirector.afterProblemPropertyChanged(entity);
It seems that the solver is executed and it manages to improve the actual solution, but it only spends a few ms on it:
org.optaplanner.core.impl.solver.DefaultSolver: Real-time problem fact changes done: step total (1), new best score (0hard/-100medium/-15soft).
org.optaplanner.core.impl.solver.DefaultSolver: Solving restarted: time spent (152), best score (0hard/-100medium/-15soft), environment mode (REPRODUCIBLE),
Therefore, the solver stops really soon, considering that my solver has a 10 seconds UnimprovedSecondsSpentLimit. So, the first time the solver is executed, it stops after 10 seconds, but the following times, it stops after a few ms and doesn't manage to get a good solution.
I am not sure I need to use "beforeProblemPropertyChanged" when the planning entity changes, but I can't find any alternative because "beforeVariableChanged" is used when the planning variable changes, right? Maybe optaplanner just doesn't support updates in the entities and I need to delete the old one using beforeEntityRemoved and inserted it again using beforeEntityAdded?
I was using BRANCH_AND_BOUND, however, I have changed to local search TABU_SEARCH and it seems that the scheduler uses 10 seconds now. However, it seems stuck in a local optima because it doesn't manage to improve the solution, even with a really small collection (10 entities).
Anyone with experience with real time planning?
Thanks
The "Solving restarted" always follows very shortly after "Real-time problem fact changes done", because real-time problem facts effectively "stop & restart" the solver. The 10 sec unimproved termination only starts counting again after the restart.
DEBUG logging (or even TRACE) will show you what's really going on.

Using Optaplanner to solve VRPTW with large number of customers and sophisticated constraints

I'm developing a solver for a VRPTW problem using the OptaPlanner and I have faced a problem when large number of customers need to be serviced. By the large number I mean up to 10,000 customers. I have tried running a solver for about 48 hours but no feasible solution was ever reached.
I use a highly customized VRPTW domain model that introduces additional planning entity so-called "Workbreak". Workbreaks are like customers but they can have a location that is actually another planning value - because every day a worker can return home or go to the hotel. Workbreaks have fixed time of departure (usually next day morning), and a variable time of arrival (because it depends on the previous entity within a chain). A hard constraint cares about not allowing to "arrive" to the Workbreak after certain point of time. There are other hard constraints too, like:
multiple service time windows per customer
every week the last customer in chain must be a special customer "storage space visit" (workers need to gather materials before the next week)
long jobs management (when a customer needs to be serviced longer than specified time it should be serviced before specific hour of a day)
max number of jobs per workday
max total job duration per workday (as worker cannot work longer than specified time)
a workbreak cannot have a location of a hotel that is too close to worker's home.
jobs can not be serviced on Sundays
... and many more - there is a total number of 19 hard constrains that have to be applied. There are 3 soft constraints too.
All the aforementioned constraints were initially written as Drools rules, but because of many accumulation-based constraints (max jobs per day, max hours per day, overtime hours per week) the overall speed of the solver (benchmarks) was about 400 step/sec.
At first I thought that solver's speed is too slow to reach a feasible solution in a reasonable time, so I have rewritten all rules into easy score calculator, and it had a decent speed - about 4600 steps/sec. I knew that is will only perform best for a really small number of customers, but I wanted to know if the Drools was the cause of that poor performance. Then I have rewritten all these rules into incremental score calculator (and survived the pain of corrupted score bugs until all of them were successfully fixed). Surprisingly incremental score calculation is a bit slower for a small number of customers, comparing to easy score calculator, but it is not an issue, because overall speed is about 4000 steps/sec - no matter how many entities I have.
The thing that bugs me the most is that above a certain number of customers (problems start at 1000 customers) the solver cannot reach feasible solution. Currently I'm using Late Acceptance and Step Counting algorithms, because they perform really good for this kind of a problem (at least for a less number of customers). I used Simulated Annealing too, but without success, mostly because I could not find good values for algorithm specific parameters.
I have implemented some custom moves too:
Composite move that changes workbreak's location when sibling entities are changed using other moves like change/swap moves (it helps escaping many score traps, as improving step usually needs at least two moves to be performed in a single step)
Move factory for better long jobs assignment (it generates moves that tries to put customers with longer service time in the front of a workday chain)
Workbreak assignment move factory (it generates moves that helps putting workbreaks in proper sequence)
Now I'm scratching my head, and wondering what I should do to diagnose the source of my problem. I suspected that maybe it was hitting a score trap, but I have modified the solver so it saves snapshots of best score each minute. After reading these snapshots I realized that the score was still decreasing. Can the number of hard constraints play the role? I suspect that many moves need to be performed to find out a move that improves the score. The fact is that maybe 48 hours isn't that much for this kind of a problem, and it should make computations a whole week? Unfortunately I have nothing to compare with.
I would like to know how to find out if it is solely a performance problem, or a solver (algorithm, custom moves, hard/soft score) configuration problem.
I really apologize for my bad English.
TL;DR but FWIW:
To scale above 1k locations you need to use NearBy selection.
To scale above 10k locations, add Partitioned Search too.

Optaplanner termination strategy

In the opta planner configuration ,there is a provision to specify the termination time out.
Is there a better way to handle the termination time out strategy? For example , my problem size is small and I have set the termination time out as 10 sec.
But I can see from the logs that the best score is obtained well within 2 - 3 seconds. Is there any means to exit once the best score is reached ?
Or should the program always run till the timeout is reached and then output the best score.
Take a look at the Termination chapter in the OptaPlanner documentation.
What you are referring to is called BestScoreTermination but it might not be what you actually want -- do note that OptaPlanner has no way of knowing if the score is "the optimal score"... unless you configure Exhaustive Search (which doesn't scale well).
Therefore, if you misjudge your problem and set the BestScoreTermination to something "better" than the optimal value, OptaPlanner will run until it tries out all combinations (which might take effectively forever on big problems). If you're looking for a compromise, take a look at "termination composition"